Opened in late 1908, the North Island Main Trunk railway (NIMT) linked Auckland with Wellington, Taranaki and Whanganui, and contributed to the development of the central North Island.

Made possible by pioneering engineering amid the challenges of a frontier land, and lately enhanced by modern technology, the NIMT is New Zealand’s most significant land route.

Earnest planning for the railway began in the 1870s with the Public Works Department's first Engineer-in-Chief, John Carruthers, and other engineers and surveyors, such as John Rochfort, scoping possible routes.

From 15 April 1885, when Maniopoto paramount chief, Wahanui Huatere (?–1897)  turned the first sod of the NIMT near Te Awamutu and Premier Robert Stout (1844–1930) wheeled it away, it took 23 years to complete the line. Another Premier, Sir Joseph Ward (1856–1930), drove the last spike on 6 November 1908. A through train service began three days later.

Most of the construction work had to be carried out by hand. Oxen, horses and small steam locomotives assisted with the bulk movement of materials. It was only in the last two years that one of New Zealand’s first steam shovels was brought in to help dig the cuttings. That was the start of a mechanical age in earthworks for this country.

The line traversed some extremely challenging terrain, especially between Te Kuiti and Marton, which posed many problems for the engineers locating the route.

The location of the Raurimu Spiral about 1898 by R. W. Holmes (1856–1936)  was the key to a workable climb from Taumarunui to the National Park summit. At that time detailed location of the final line was still a field engineer’s decision. The required 132 m rise over a distance of 2 km in a direct line was achieved by the use of the famed “Spiral” loop and horseshoe curves using the topography very skilfully to minimise cut, fill and tunnelling.

North Island Main Trunk Railway

Raurimu Spiral and National Park / E. M. Lovell-Smith, 1929-1930. Alexander Turnbull Library, Wellington, New Zealand.

The bridgeworks designed by the Public Works Department (PWD), and built by the PWD and engineering firms such as Andersons Limited of Christchurch, were to the best standards of the day and were surprisingly modern. The Mangaweka Viaduct (now demolished) was typical of many of the major structures on the North Island Main Trunk. Most of these viaducts had their steelwork fabricated in the pioneering settlements such as Mangaonoho and Makatote. (There is still an Ironworks Road at Mangaonoho, although the sites of both workshops are less obvious).

Andersons’ workshop at Makatote Viaduct was extremely well equipped for its time. It had electric overhead travelling cranes and the cableway used to erect the viaducts was electrically controlled as well.

North Island Main Trunk Railway

Hapuawhenua Viaduct [circa 1909]. Alexander Turnbull Library, Wellington, New Zealand.

After the completion of the railway the Government purchased the Wellington and Manawatu Railway, which meant that the entire route from Wellington to Auckland was now owned by the Crown.

The design loading for bridges and viaducts was an engine of 84 tons, although the 94-ton “X” Class were used from the opening of the line. Following detailed strengthening these structures have carried the 145-ton “K” and “Ka” locomotives, while those retained on the now electrified route carry the 106-tonne “30” Class electrics of even higher axle loading than the steamers.

The electrification of the NIMT in the 1980s was another significant period of change.

North Island Main Trunk Railway

A scene on the route of the North Island main trunk railway at the Hapuawhenua viaduct, near Ohakune. Alexander Turnbull Library, Wellington, New Zealand.

Heritage recognition

The central section of the NIMT has been recognised by Heritage New Zealand as a historic area (List no.7793): North Island Main Trunk (NIMT) Historic Area:New Zealand Heritage List/Rarangi Korero information.

IPENZ “Engineering to 1990” project

This item of New Zealand’s engineering heritage was recognised as part of the IPENZ “Engineering to 1990” project, which the Institution organised to help celebrate the country’s sesquicentenary in 1990. A plaque was unveiled to mark the significance of this rail line as part of the development of the nation.


More information

Access

At various stages it is adjacent to State Highway 1 (Auckland to Hamilton and Waiouru to Wellington).  Through the central North Island (Hamilton to Ohakune) its route is similar to that of State Highway 4.

The monument celebrating the Last Spike is near the Manganui O te Ao River on State Highway 4.

Next to State Highway 4 at Raurimu there is a viewing platform for the Raurimu Spiral.  

References

'The North Island main trunk line,' New Zealand History Online (Ministry for Culture and Heritage), updated 22 August 2013.

R S Fletcher, Single Track, The Construction of the North Island Main Trunk Railway, Collins, Auckland, 1978.

A L R Merrifield, 'New Zealand’s North Island Main Trunk Railway: 1870-1908,' Proceedings of the Institution of Civil Engineers, Vol 162, Issue EH4, November 2009.

A L R Merrifield; 'A Centennial Review of the North Island Main trunk Railway: Geology of the West-Central North Island and its Influence on Transport Development,' Proceedings of 3rd Australasian Engineering Heritage Conference, 2009.

Bill Pierre, North Island Main Trunk, An Illustrated History, Reed, Wellington, 1981.

F K Roberts, A Compendium of Railway Construction, Part II, North Island Main Trunk, New Zealand Railway & Locomotive Society, Wellington, 1990.

Location

The North Island Main Trunk goes from Auckland to Wellington. It travels through Auckland, Waikato, King Country, the Central Plateau, Wanganui/Manawatu and Wellington/Kapiti.